Important:
Prospective bidders and vendors are welcome to download Bid or RFP documents from this site. Not all required documents are available on this site, for example construction drawings. It is the Vendor's responsibility to obtain those documents from the Purchasing Office 303.441.3525.
Bidders, Vendors and contractors are
responsible for checking this site for Addendums, and to advise the
Purchasing Office with their intent to participate.
The Purchasing Department is not responsible for interruptions or technical difficulties in website access or operation.
2008
January, February, March, April, May June
July , August, September, October November December
| Date Posted | Due Date | Bid/RFP # | Description | Special Instructions | Addendum | Awarded Vendor |
| 12/19/2008 | December 23, 2008 4:00 PM |
|
In-House Professional Training | |||
| 12/01/2008 | December 22, 2008 2:00 PM |
5072-08 | Transit Signal Design | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Wednesday, December 10, 2008. All responses from the County to all inquires shall be sent via email no later than Monday, December 15, 2008 |
Addendum #1 |
|
| 12/05/2008 | December 19, 2008 2:00 PM |
5082-08 | Ford Escape Hybrids/Equivalent | GO COURTESY FORD | ||
| 12/02/2008 | December 18, 2008 2:00 PM |
5081-08 | County Building Waste Collection Services | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Wednesday, December 10, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, December 12, 2008 | ||
| 12/01/2008 | December 18, 2008 2:00 PM |
5077-08 | Fire Sprinkler Project at Recycling Center | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Tuesday, December 9, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, December 12, 2008 | ||
| 11/21/2008 | December 17, 2008 2:00 PM |
5078-08 | Mechanical/Electrical Engineering Services | |||
| 11/19/2008 | December 11, 2008 2:00 PM |
5069-08 | Public Health Planning & Outreach Research Project
|
All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 2:00 p.m., Monday, December 1, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, December 5, 2008 | Addendum #1 | JOHN SNOW, INC. (JSI)
|
| 11/20/2008 | December 10, 2008 2:00 PM |
5076-08 | Canon Copier Machines | All-Copy Products | ||
| 11/10/2008 | December 9, 2008 2:00 PM |
Hazard Waste, Universal Waste, and Non-Hazardous Waste, Recycling, Treatment, and Disposal Services for The Boulder County Hazardous Materials Management Program and Boulder County Departments | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Monday, December 1, 2008. All responses from the County to all inquires shall be sent via email no later than Wednesday, December 3, 2008 | Addendum #1 |
| Date Posted | Due Date | Bid/RFP # | Description | Special Instructions | Addendum | Awarded Vendor |
| 11/10/2008 | November 24, 2008 2:00 PM |
5071-08
|
AGRICULTURAL LEASES PARKS & OPEN SPACE PROPERTIES |
A RECOMMENDED PRE-PROPOSAL MEETING will be held on MONDAY, NOVEMBER 17, 2008, 10:00 a.m., at the Boulder County Fairgrounds Meeting Room, 9595 Nelson Road, Longmont, Colorado 80501. Please call Glenda Rowe at 303/678-6226 or Phill Leffler at 303/678-6111, for directions. To be best informed, interested parties are strongly encouraged to attend both the pre-proposal meeting and tours.
Immediately following the pre-proposal,
the following property tours will be held: The Bishop property tour will be held on TUESDAY, November 18, 2008 at 2:00 p.m. Please see proposal packet for directions to the properties.
|
PIAZZA OPEN SPACE Mark Anthony Svetlik JAMES OPEN SPACE STINN OPEN SPACE |
|
|
11/05/2008 |
November 21, 2008 2:00 PM |
5075-08 | FINANCIAL ADVISORY SERVICES | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Wednesday, November 12, 2008. All responses from the County to all inquires shall be sent via email no later than Monday, November 17, 2008 | Addendum #1 | |
| 10/31/2008 | November 20, 2008 2:00 PM |
5073-08
Modular Manufacturer Document |
MODULAR HOME BUILDER DESIGN/BUILD SERVICES | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Friday, November 7, 2008. All responses from the County to all inquires shall be sent via email no later than Wednesday, November 12, 2008 |
Addendum #1 |
REJECTED |
| 10/30/2008 | November 18, 2008 2:00 PM |
5074-08 | HIGH DECK PAVER | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Friday, November 7, 2008. All responses from the County to all inquires shall be sent via email no later than Wednesday, November 12, 2008 | MACDONALD EQUIPMENT COMPANY | |
| 10/27/2008 | November 18, 2008 2:00 PM |
GENERAL CONTRACT CONDITIONS
GENERAL CONDITIONS FOR NON-CONSTRUCTION CONTRACTS
|
SINGLE/MULTI FAMILY UNITS AND MOBILE HOMES CONTRACTOR TRADES FOR BOULDER COUNTY HOUSING AUTHORITY |
|||
| 10/14/2008 | November 12, 2008 2:00 PM |
5063-08 | ORGANICS WASTE MANAGEMENT CONSULTANT | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Wednesday, November 5, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, November 7, 2008. | Addendum #1 | |
| 10/16/2008 | November 3, 2008
|
5067-08 | 2008 CONCRETE REPLACEMENT PROJECT | Plans and specifications will be available for a $20.00, non-refundable fee, on or after MONDAY, OCTOBER 20, 2008, AFTER 2:00 P.M. at the office of Boulder County Transportation Department, Courthouse Annex, 2045 13th Street, Boulder, Colorado. OR email mortiz@bouldercounty.org for a PDF version of the plans and specifications at no cost. |
| Date Posted | Due Date | Bid/RFP # | Description | Special Instructions | Addendum | Awarded Vendor |
| 10/10/2008 | October 31, 2008 2:00 PM |
5065-08 | FOOD & NON-FOOD ITEMS FOR THE BOULDER COUNTY JAIL CALENDAR YEAR 2009 | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to smeisinger@bouldercounty.org by 4:00 p.m., Friday, October 17, 2008. All responses from the County to all inquires shall be sent via email no later than Monday, October 20, 2008. |
Galligan Wholesale Meats - Meats & Entrees Front Range Wholesale - Kosher Foods, Breakfast Foods, Fruits, Vegetables, Staple Foods, Beverages, Spices, Desserts, & Condiments Northern Colorado Paper - Non-Food Items & Cleaning Supplies Bimbo Bakeries - Baked Goods Robinson Dairy – Dairy Products |
|
| 10/10/2008 | October 29,2008 2:00 PM |
5066-08 | CENTERA DISK ARCHIVAL APPLIANCE | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Monday, October 20, 2008. All responses from the County to all inquires shall be sent via email no later than Wednesday, October 22, 2008. | Addendum #1 | DELL INC. |
| 10/03/2008 | October 20, 2008 2:00 PM |
5064-08 | PRE-CAST CONCRETE BOX CULVERT | Addendum #1 | OLD CASTLE PRECAST | |
| 9/23/2008 | October 17, 2008 2:00 PM |
5062-08 | SHERIFF'S OFFICE VEHICLE EQUIPMENT AND INSTALLATION | WIRELESS ADVANCED COMMUNICATIONS | ||
| 09/26/2008 | October 13, 2008 2:00 PM |
5054-08 | ON CALL SERVICES FOR THE BOULDER COUNTY TRANSPORTATION DEPARTMENT | Transportation Planning and
Trails/Transit: David Evans and Associates, Inc. Fehr and Peers Transportation Consultants LSA Associates, Inc. Charlier Associates, Inc.
Environmental: Utility Locates: Fleet Management: Appraisal: Right-of-Way Procurement: Landscape Architects: Rockfall: General Civil: Survey: Geotechnical:
|
||
| 9/19/2008 | October 13, 2008 2:00 PM |
5060-08 | NETWORKED PRINTER TONER CARTRIDGES | Addendum #1 | RE-MANUFACTURED OEM
|
|
| 9/17/2008 | October 13, 2008 2:00 PM |
5057-08 | HALFWAY HOUSE & WORK RELEASE SERVICES | A Mandatory, Pre-proposal conference will be held on Tuesday, September 30, 2008 at 10:30 AM - 11:30 AM, at the Aragon Conference Room located at 202013th Street, 1st Floor, Boulder, CO 80302. Proposals will not be accepted from those firms that are not in attendance. | CORRECTIONAL MANAGEMENT INC. | |
| 10/01/2008 | October 10, 2008 2:00 PM |
I316-08 | PREPARATION OF A-87 ANNUAL COST ALLOCATION FOR THE YEAR ENDING 12/31/2008 | |||
| 9/24/2008 | October 7, 2008 2:00 PM |
I315-08 | APPLE VALLEY BRIDGE REHABILITATION PROJECT US HWY 36 & APPLE VALLEY ROAD | |||
| 9/22/2008 | October 7, 2008 2:00 PM |
5059-08 | DESIGN AND ENGINEERING SERVICES | CIVIL TETRA TECH DREXEL BARREL & CO MECHANICAL ELECTRICAL SOILS & GEOTECHNICAL STRUCTURAL LANDSCAPE FIRE PROTECTION ROOFING LEED
|
||
| 9/12/2008 | October 7, 2008
|
5052-08 | AGRICULTURAL LEASES PIAZZA, JAMES, STINN, AND BISHOP AGRICULTURAL OPEN SPACE PROPERTIES |
Optional pre-bid meeting, 10
AM Tuesday, September 23, 2008, 5201 St. Vrain Road, Longmont, CO. Optional tours of the properties will be held on Wednesday, September 24, 2008, and Thursday, September 25, 2008, See the RFP document for the schedule. Attendance to both the pre-bid meeting and the property tour is strongly encouraged so that you can submit an informed bid.
|
CANCELLED PLEASE SEE RFP 5071-08 |
|
| 9/18/2008 | October 6, 2008 9:00 AM |
5061-08 | 2008 GUARDRAIL IMPROVEMENTS |
Plans and specifications will be available for a $20.00, non-refundable fee, on or after MONDAY, SEPTEMBER 22, 2008, AFTER 1:00 P.M. at the office of Boulder County Transportation Department, Courthouse Annex, 2045 13th Street, Boulder, Colorado. OR email rwalters@bouldercounty.org for a PDF version of the plans and specifications at no cost.
|
ADARAND CONSTRUCTORS INC. | |
| 9/17/2008 | October 1, 2008 2:00 PM |
5058-08 | TRANSPORTATION HOUSING REMODEL FLOORING BID |
Plans and project manuals
will be available Tuesday, September 23, 2008 10:00 AM at the Purchasing
Department in the Boulder County Courthouse West Wing (First Floor),
2020 13th Street, or please call 303-441-3525 to make alternate
arrangements. A pre-bid walk-through will be held Thursday, September 25, 2008 at 10:00 AM at the project site. The site is located at 2525 13th Street, Boulder, CO 80304. Bidders are to meet the County Representative inside the main entrance on the second floor of the parking garage. |
Addendum #1 | COLORADO CARPET CENTER INC. |
| Date Posted | Due Date | Bid/RFP # | Description | Special Instructions | Addendum | Awarded Vendor |
| 9/15/2008 | September, 29, 2008 2:00 PM |
5056-08 | ON-LINE HEALTH AND BENEFITS ENROLLMENT SOFTWARE APPLICATION | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Wednesday, September 17, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, September 19, 2008. |
Addendum #1 |
THE CENTER TO PROMOTE
HEALTH CARE ACCESS ONE E-APP |
| 8/27/2008 | September 26, 2008 2:00 PM |
5049-08 | ROCKY MOUNTAIN 3 CENTER PIVOT SPRINKLER PROJECT | A
Mandatory, Pre-proposal conference will be held on Wednesday
September 3, 2008 at 10:00 AM, at the Rocky Mountain 3 Property, in
the field across from 11715 Vermillion Road, Longmont. Proposals will not be
accepted from those firms that are not in attendance. All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Friday, September 5, 2008. All responses from the County to all inquires shall be sent via email no later than Monday, September 8, 2008. |
Addendum #1 | VALLEY IRRIGATION |
| 09/09/2008 | September 24, 2008 2:00 PM |
5055-08 | BOULDER COUNTY HOUSING AUTHORITY ADA IMPROVEMENTS | A
Mandatory, Pre-proposal conference will be held on Tuesday,
September 16, 2008 at 10:00 AM, at the 1585 Sagrimore Circle,
Lafayette, CO 80026. Proposals will not be
accepted from those firms that are not in attendance. All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 12:00 p.m., Wednesday, September 17, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, September 19, 2008. |
CANCELLED | |
| 8/27/2008 | September 19, 2008 2:00 PM |
5051-08 | HENRY EASTLACK EQUIPMENT STORAGE/FARM SHOP BUILDING |
PRE-BID MEETING on Monday, September 8, 2008 at 10:00 AM For
further information, contact Jim Michal (303) 678-6243 office, or (303)
817-4179 Cell. Although
this is not a Mandatory Meeting, bidders are strongly encouraged to
attend.
All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Thursday, September 11, 2008. All responses from the County to all inquires shall be sent via email no later than Monday, September 15, 2008.
|
Addendum #1 | |
|
9/08/2008 |
September 18, 2008 |
SUPPLEMENT TO COUNTY EMPLOYEE HEALTH CARE HEARING PLAN |
EPIC HEARING HEALTH |
|||
| 9/05/2008 | September 18, 2008 2:00 PM |
5053-08 | 2ND FLOOR OLD KAISER BUILDING LIGHTING & CONTROLS PACKAGE | QED | ||
| 9/2/2008 | September 18, 2008 2:00 PM |
5050-08 | CUSTODIAL CLEANING CHEMICALS | RASCO JANITORIAL SUPPLY
(WINDOW CLEANER & DISINFECTANT CLEANER) WESTERN PAPER DISTRIBUTORS (NEUTRAL FLOOR CLEANER, THE RESTROOM CLEANER, AND THE ALL-PURPOSE CLEANER) |
||
| 9/04/2008 | September 17, 2008 4:00 PM |
I310-08 | GENETIC PATERNAL TESTING | Addendum #1 | LABORATORY CORP OF AMERICA | |
| 8/11/2008 | September 15, 2008 2:00 PM |
5046-08 | KODAK SCANNERS |
|
CDW GOVERNMENT INC. | |
| 8/7/2008 | September 12, 2008 2:00 PM |
5043-08
Pipeline Summary |
MACY AGRICULTURE OPEN
SPACE STATE HIGHWAY 52 IRRIGATION PIPELINE PROJECT |
PRE-BID MEETING on Friday, August 22, 2008 at 10:00 AM at Macy property, 10663 Lookout Road, Longmont, Colorado. Although this is not a Mandatory Meeting, bidders are strongly encouraged to attend. All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Wednesday, August 27th, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, August 29, 2008. |
Addendum #1 | INTERSTATE IRRIGATION INC. |
| 8/8/2008 | September 4, 2008 2:00 PM |
|
CLERK & RECORDER CHILLER
RELOCATION AND AC UNIT ADDITION |
PRE-BID MEETING on Tuesday, August 26, 2008 at 10:00 AM at 1750 33rd Street, Boulder, CO. Main Lobby Clerk & Recorders on East side of the building. Although this is not a Mandatory Meeting, bidders are strongly encouraged to attend. | Addendum #1 |
ECS INC.
|
| 8/08/08 | September 2, 2008 2:00 PM |
ST. VRAIN BUILDING AIR HANDLER REPLACEMENTS | PRE-BID MEETING on Tuesday, August 19, 2008 at 10:00 AM at 529 Coffman Street. Meet on the West side building entry Longmont, Colorado. Although this is not a Mandatory Meeting, bidders are strongly encouraged to attend. | Addendum #1 | CONTRACTOR HEATING INC. | |
| 8/15/2008 | September 2, 2008 2:00 PM |
5047-08
INFORMATION SHEET AT OPEN HOUSE
|
OPERATION OF CHERRY CREEK TREE FARMS | A property tour has been scheduled for Tuesday, August 26, 9:00 a.m. Interested parties should meet at the property located at the SW corner of Isabelle Road and Highway 287, just west of Erie, CO. ENTER off of Highway 287 at the gate approximately 1/8 mile south of Isabelle Rd. | Addendum #1 | REJECTED |
| Date Posted | Due Date | Bid/RFP # | Description | Special Instructions | Addendum | Awarded Vendor |
| 7/21/2008 | August 25, 2008 2:00 PM |
5039-08
|
MOSQUITO CONTROL | A Mandatory, Pre-proposal conference will be held on Tuesday, August 12, 2008 at 10:00 AM, in the Aragon Conference Room, located at 2020 13th Street, Boulder, CO 80302. Proposals will not be accepted from those firms that are not in attendance. | ||
| 7/28/2008 | August 20, 2008 2:00 PM |
5042-08 | Mail Pre-Sort Services | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Monday, August 11th, 2008. All responses from the County to all inquires shall be sent via email no later than Wednesday, August 13, 2008. | ||
| 7/21/2008 | August 11, 2008 2:00 PM |
5038-08 | 2008 FORESTRY SERVICES- REYNOLDS RANCH | A Mandatory, onsite proposal meeting will be held at 10800 Magnolia Road (approx.)Nederland, CO 80466 on Thursday, July 31, 2008 at 9:00 AM for all prospective contractors. All units included in this project will be reviewed at this time. Duration of the meeting will be dictated by the prospective contractors and will last until all relevant field questions have been answered. Questions regarding the project will be addressed only at this meeting. Written inquires may be directed to Scott Golden, project administrator, at 303-678-6209 or sgolden@bouldercounty.org and will only be answered at the pre-bid meeting. Proposals will not be accepted from those firms that are not in attendance. | MORGAN TIMBER PRODUCTS | |
| 7/23/2008 | August 6, 2008 1:30 PM |
5040-08 | PROJECT
RD-039-153
|
Plans and
specifications will be available for a $20.00, non-refundable fee, on or
after TUESDAY, JULY 22, 2008, AFTER 1:00 PM at the office of Boulder
County Transportation Department, Courthouse Annex, 2045 13th Street,
Boulder, Colorado. MANDATORY PRE-BID MEETING on JULY 30, 2008 at 9:00 AM at the Open Space and Transportation Complex (OSTC), 5201 St. Vrain Road, Road Maintenance Building #5. (DO NOT MAP QUEST THIS SITE) OSTC is located North of the Vance Brand Airport in Longmont, Northeast Corner of the Campus. Call (303) 441-3962 for directions. A site visit will follow the Pre-bid meeting and will be the only site visit attended by County Personal. |
ASPHALT SPECIALTIES COMPANY INC. | |
|
7/21/2008 |
August 1, 2008 2:00 PM |
PROJECT MANUAL
BID FLOORING
COVER SHEET
|
ARC FLOORING REMODEL | Plans and
project manuals will be available on Friday, July 18, 2008 at 1:00 PM at
the Purchasing Department in the Boulder County Courthouse West Wing
(First Floor), 2020 13th Street, or please call 303-441-3525 to make
alternate arrangements. A pre-bid walk-through will be held Thursday, July 24, 2008 at 10:00 AM at the project site. The site is located at the intersection of Broadway and Iris Ave. in North Boulder. Bidders are to meet the County Representative inside the main (west) entrance. The pre-bid conference is not mandatory, but bidders are strongly encouraged to attend. It is the bidder's responsibility to be familiar with all pre-existing conditions that may affect their bid.
|
ITEM #1-CARPET & RESILIENT
FLOORING COLORADO CARPET CENTER, INC
ITEM #2- |
| Date Posted | Due Date | Bid/RFP # | Description | Special Instructions | Addendum | Awarded Vendor |
| 7/21/2008 | July 31, 2008 2:00 PM |
5035-08 | Transportation/Housing HVAC Remodel | Plans and
project manuals will be available on Monday, July 21, 2008 at 10:00 AM
at the Purchasing Department in the Boulder County Courthouse West Wing
(First Floor), 2020 13th Street, or please call 303-441-3525 to make
alternate arrangements. A pre-bid walk-through will be held Wednesday, July 23, 2008 at 10:00 AM at the project site. The site is located at 2525 13th Street, Boulder, CO 80304. Bidders are to meet the County Representative inside the main entrance on the second floor of the parking garage. Parking is available on the second level of the parking garage. The pre-bid conference is not mandatory, but bidders are strongly encouraged to attend. It is the bidder's responsibility to be familiar with all pre-existing conditions that may affect their bid. |
Addendum #1 | MEYER'S HEATING & AC INC. |
| 6/30/2008 | July 23, 2008
|
5027-08 | FEEDER CANAL MASTER TRAIL PLAN | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Wednesday, July 9th, 2008. All responses from the County to all inquires shall be sent via email no later than Monday, July 14, 2008. | Addendum #1 | LORIS & ASSOCIATES INC |
| 6/30/2008 | July 21, 2008 2:00 PM |
5031-08 | SOLAR PV GRID CONNECTED SYSTEMS |
All other inquires regarding the proposal
document shall be submitted in writing to the Purchasing Office, located
at 2020 13th Street, 1st Floor, Boulder CO 80306,
or emailed to
jolberding@bouldercounty.org and to
mmckibben@bouldercounty.org by
4:00 p.m., Monday, July 14th, 2008. All responses from the County to all
inquires shall be sent via email no later than Wednesday, July 16, 2008.
On site evaluations will be available on the
following days and times. Appointments must be made by July 11, 2008
4:00 PM. Call Paul Melamed, VisionSun
Design LLC, at 303-459-3412.
|
||
| 6/27/2008 | July 16, 2008 2:00 PM |
5033-08 | CISCO UNIFIED COMMUNICATION MANAGER UPGRADE | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Tuesday, July 8th, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, July 11, 2008. | Addendum #1 | INFORMATION SYSTEMS CONSULTING (ISC) |
| 7/2/2008 | July 15, 2008 2:00 PM |
5034-08 | WOODY BIOMASS TRANSPORTATION SERVICES | A1 ORGANICS | ||
| 6/04/2008 | July 15, 2008 2:00 PM |
5025-08 | DOCUMENT SCANNING PROJECT | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Friday, June 27th, 2008. All responses from the County to all inquires shall be sent via email no later than Tuesday, July 1, 2008. | Addendum #1 | SOLANY LLC |
| 6/20/2008 | July 14, 2008 2:00 PM |
5028-08 | IBM CONNECTOR TRAIL & 95TH ST. BRIDGE OVER LEFTHAND CREEK | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 12:00 p.m., Wednesday, July 2nd, 2008. All responses from the County to all inquires shall be sent via email no later than Wednesday, July 9, 2008. | Addendum #1 | CENTENNIAL ENGINEERING INC. |
| 6/20/2008 | July 9, 2008 2:00 PM |
5032-08 | ALCOHOL RECOVERY CENTER (ARC) LIGHTING & CONTROLS PACKAGE | WINLECTRIC OF NORTHGLENN | ||
| 6/17/2008 | July 1, 2008 2:00 PM |
5030-08 | HEWLETT PACKARD PRINTERS | CORPORATE EXPRESS |
| Date Posted | Due Date | Bid/RFP # | Description | Special Instructions | Addendum | Awarded Vendor |
| 6/6/2008 | June 20, 2008 2:00 PM |
5026-08 | 2008 CISCO NETWORK EQUIPMENT | ISC INC. | ||
| 6/12/2008 | JUNE 19, 2008 2:00 PM |
5029-08 | REFRIGERATOR REPLACEMENT | REJECTED | ||
| 5/22/2008 | June 19, 2008 2:00 PM |
5024-08 | ADA CURB RAMP INSTALLATION |
MANDATORY PRE-PROPOSAL CONFERENCE & Job Walk will be held on Thursday June 5th at 9:30 a.m. at Prime Haven Senior Housing Development, 170 E 2nd Street, Nederland, CO 80466. RFP'S FROM FIRMS NOT ATTENDING THE PRE-PROPOSAL CONFERENCE WILL NOT BE ACCEPTED All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Tuesday, June 10th, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, June 13, 2008. |
||
| 5/20/2008 | June 12, 2008 2:00 PM |
WEATHERIZATION MATERIALS TABULATION
|
WEATHERIZATION MATERIALS | |||
| 5/23/2008 | June 11, 2008 2:00 PM |
5022-08 | TOWING SERVICES | NORTHERN SECTION: RELIABLE TOWING & REPAIR SOUTHERN
SECTION: |
||
| 5/12/2008 | June 10, 2008 2:00 PM |
5021-08 | CABINET MATERIALS & INSTALLATION AT THE LILAC HOUSING COMPLEX |
MANDATORY PRE-PROPOSAL CONFERENCE & Job Walk will be held on Thursday May 29th at 10:00 a.m. at 1301 Lincoln Ave, Louisville, CO 80027-2831. RFP'S FROM FIRMS NOT ATTENDING THE PRE-PROPOSAL CONFERENCE WILL NOT BE ACCEPTED All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Monday, June 2nd, 2008. All responses from the County to all inquires shall be sent via email no later than Wednesday, June 4, 2008.
|
A&B CONSTRUCTION, LLC | |
| 5/12/2008 | June 10, 2008 2:00 PM |
5020-08 | CABINET MATERIALS & INSTALLATION AT THE ACME HOUSING COMPLEX |
MANDATORY PRE-PROPOSAL CONFERENCE & Job Walk will be held on Wednesday May 28th at 10:00 a.m. at 504 LaFarge Street, Louisville, CO 80027-1868. RFP'S FROM FIRMS NOT ATTENDING THE PRE-PROPOSAL CONFERENCE WILL NOT BE ACCEPTED All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Friday, May 30th, 2008. All responses from the County to all inquires shall be sent via email no later than Tuesday, June 3, 2008. |
CANCELLED | |
|
05/01/2008 |
June 9, 2008 2:00 PM |
|
BROKERAGE & RISK MANAGEMENT SERVICES | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Thursday, May 15th, 2008. All responses from the County to all inquires shall be sent via email no later than Friday, May 23, 2008. | MARSH USA | |
| 5/22/08 | June 4, 2008 2:00 PM |
5002-08
PROJECT MANUAL DRAWINGS |
ADDICTION RECOVERY CENTER DOORS AND WINDOWS |
Plans and project manuals will be available on Friday, May 23, 2008 at 8:00 AM at the Purchasing Department in the Boulder Courthouse West Wing (First Floor), 2020 13th Street, or Please call 303-441-3525 to make alternate arrangements. A pre-bid walk-through will be held Wednesday, May 28, 2008 at 11:00 AM at the project site. The site is located at the intersection of Broadway and Iris Ave. In north Boulder. Bidders are to meet the County Representative inside the main (west) entrance. The pre-bid conference is not mandatory, but bidders are strongly encouraged to attend. It is the bidder's responsibility to be familiar with all pre-existing conditions that may affect their bid.
|
Addendum #1 | ITEM #1 INTERIOR DOORS, FRAMES
AND HARDWARE COLORADO DOORWAY, INC ITEM #2 EXTERIOR ALUMINUM WINDOWS TOLEDO GLASS |
| Date Posted | Due Date | Bid/RFP # | Description | Special Instructions | Addendum | Awarded Vendor |
| 5/2/2008 | MAY 30, 2008
|
I309-08 | COMM CENTER FURNITURE QUOTE | |||
| 5/8/2008 | MAY 29, 2008 2:00 PM |
5019-08 | EXTERIOR PAINTING OF REGAL COURT HOUSING COMPLEX | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Monday, May 19th, 2008. All responses from the County to all inquires shall be sent via email no later than Wednesday, May 21, 2008. | ACCENT PAINTING | |
| 5/16/2008 | MAY 28, 2008
|
5001-08
Project Manual Boulder County Public Health Addiction
Recovery Center Plans |
ADDICTION RECOVERY CENTER ROOF |
Plans
and project manuals will be available on Friday, May 16, 2008 at 8:00
AM at the Purchasing Department in the Boulder Courthouse West Wing
(First Floor), 2020 13th Street, or Please call 303-441-3525 to make
alternate arrangements. A pre-bid walk-through will be held Thursday, May 22, 2008 at 11:00 AM at the project site. The site is located at the intersection of Broadway and Iris Ave. In north Boulder. Bidders are to meet the County Representative inside the main (west) entrance. The pre-bid conference is not mandatory, but bidders are strongly encouraged to attend. It is the bidder's responsibility to be familiar with all pre-existing conditions that may affect their bid. |
Addendum #1 | BLACK ROOFING |
| 4/15/2008 | MAY 23, 2008 2:00 PM |
5008-08 | PRINTING & MAILING OF 2008 TABOR NOTICES | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Monday, May 12th, 2008. All responses from the County to all inquires shall be sent via email no later than Thursday, May 15, 2008. | Addendum #1 | LONGMONT DAILY TIMES CALL |
| 5/5/2008 | MAY 22, 2008 2:00 PM |
5017-08 | BENJAMIN PROPERTY & BETASSO PRESERVE TRAIL STUDY | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Monday, May 12th, 2008. All responses from the County to all inquires shall be sent via email no later than Wednesday, May 14, 2008. | Addendum #1 | IMBA TRAIL SOLUTIONS |
| 5/01/2008 | MAY 21, 2008
|
5018-08 | 2008 OVERLAY PROJECT |
Plans and specifications will be available for a $20.00 FOR PLANS AND NO CHARGE FOR PLANS ON CD, non-refundable fee, on or after TUESDAY, MAY 6, 2008 at the office of Boulder County Transportation Department, Courthouse Annex, 2045 13th Street, Boulder, Colorado.
|
ASPHALT PAVING COMPANY | |
| 4/29/2008 | MAY 20, 2008 2:00 PM | 5015-08 | WOODY BIOMASS TRANSPORTATION SERVICE | NO BIDS RECEIVED | ||
| 4/29/2008 | MAY 15, 2008 2:00 PM |
5016-08 | MONTHLY RENTAL FOR A RUBBER-TIRED LOG SKIDDER | DDI EQUIPMENT | ||
| 4/23/2008 | MAY 15, 2008 2:00 PM |
5013-08 | COURTHOUSE STONE REPAIR | MANDATORY PRE-PROPOSAL CONFERENCE & Job Walk will be held on Tuesday May 6th at 9:00 a.m. at the Courthouse first floor lobby. Located at 1325 Pearl Street. RFPS FROM FIRMS NOT ATTENDING THE PRE-PROPOSAL CONFERENCE WILL NOT BE ACCEPTED | AMMEX MASONRY INC | |
| 4/25/2008 | MAY 15, 2008 2:00 PM |
5014-08 | BOULDER COUNTY BIOMASS UTILIZATION FEASIBILITY STUDY | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Tuesday, May 6, 2008. All responses from the County to all inquires shall be sent via email no later than Thursday, May 8, 2008. | AGENCY CTA | |
| 4/22/2008 | MAY 14, 2008 2:00 PM |
5012-08 | BOULDER COUNTY HOUSING AUTHORITY MORTGAGE FINANCING | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Thursday, May 1, 2008. All responses from the County to all inquires shall be sent via email no later than Tuesday, May 6, 2008. | Addendum #1 | |
| 4/21/2008 | MAY 12, 2008 2:00 PM |
5009-08 | TRASH SERVICES & ON SITE RESTROOM CLEANING |
A pre-proposal tour will be conducted on Tuesday, April 29, 2008, however, attendance is not mandatory. The tour will last approximately four (4) hours and will consist of on-site visits to each area that will be included in the “trash run”. Interested parties will meet at the Boulder County Parks and Open Space Department, 5201 St. Vrain Road, Longmont, 80503 at 8:00 a.m., Tuesday April 29, 2008. Directions are as follows: The POS building is located in NW Longmont, between N/S streets, Airport Road and 75th Street, and E/W streets, 17th Avenue and Nelson Road. Please do not Map quest directions as these directions will take you west of 75th Street. If you need further assistance, please call 303/678-6200, Monday through Friday, 8am-4:30 pm.
|
Addendum #1 | NO BIDS RECEIVED |
| 4/18/2008 | MAY 9, 2008 2:00 PM |
5011-08 | SKIDSTEER | BOBCAT OF THE ROCKIES | ||
| 4/21/2008 | MAY 8, 2008 2:00 PM |
5010-08 | PULL TYPE TILE PLOW | NO BIDS |
| Date Posted | Due Date | Bid/RFP # | Description | Special Instructions | Addendum | Awarded Vendor |
| 4/11/2008 | APRIL 30, 2008 2:00 PM |
5007-08 | EMULSIFIED ASPHALT | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., Friday, April 18. All responses from the County to all inquires shall be sent via email no later than Tuesday, April 22, 2008. | COBITCO INC | |
| 4/11/2008 | APRIL 30, 2008 2:00 PM |
5005-08 | ELEVATOR MAINTENANCE | MANDATORY PRE-PROPOSAL CONFERENCE & Job Walk will be held on Monday, April 21, 2008 at 10:00 a.m. at the lobby of the main Courthouse, located at 13th and Spruce Streets in Boulder. RFP'S FROM FIRMS NOT ATTENDING THE PRE-PROPOSAL CONFERENCE WILL NOT BE ACCEPTED | ELEVATOR'S UNLIMITED INC. | |
| 4/04/2008 | APRIL 29, 2008 2:00 PM |
5004-08 | BIO-MASS CATWALK |
MANDATORY PRE-PROPOSAL CONFERENCE & Job Walk will be held on Tuesday, April 15, 2008 at 9:00 a.m. at the Open Space Transportation Center. (OSTC) RFP'S FROM FIRMS NOT ATTENDING THE PRE-PROPOSAL CONFERENCE WILL NOT BE ACCEPTED Directions to OSTC from Hwy119 (Diagonal) and Hover Road:- Go West on 119 to Airport Road and turn right (North).- Take Airport Road North past Nelson Road and the Airport, then turn left (West) on St. Vrain Road.- 5201 St. Vrain is on the south side of the Road and is a large complex of buildings.- The Biomass building is the small building in the center of the complex at the end of the asphalt entry drive
|
MOUNTAIN VIEW WELDING | |
| 4/14/2008 | APRIL 28, 2008 2:00 PM |
5006-08 | TRACK EXCAVATOR | WAGNER EQUIPMENT COMPANY | ||
| 3/28/2008 | APRIL 28, 2008 2:00 PM |
4994-08 | RECORDING, IMAGING, E-RECORDING SYSTEM FOR THE BOULDER COUNTY CLERK AND RECORDER'S OFFICE | All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to jolberding@bouldercounty.org and to mmckibben@bouldercounty.org by 4:00 p.m., April 14. All responses from the County to all inquires shall be sent via email no later than April 21, 2008. | Addendum #1 | RECORD FUSION |
| 4/3/2008 | APRIL 23, 2008 2:00 PM |
5003-08
INSTRUCTIONS CERTIFICATIONS GENERAL CONDITIONS |
FLOORING MATERIALS AND INSTALLATION FOR MULTI-HOUSE FAMILY SITES |
A sample property will be available for inspection. If the Contractor wishes to arrange access to this property please contact Don Roybal, Maintenance Supervisor, 720.564.2270.All other inquires regarding the proposal document shall be submitted in writing to the Purchasing Office, located at 2020 13th Street, 1st Floor, Boulder CO 80306, or emailed to |